Allocating Limited Transformer Capacity: Define What “Fair” Means

  • Chenfan Power

When transformer capacity constrains charging, specify the allocation objective. Alyami ranks deadline and required energy to maximise completed requests [1]; that is one objective, not a universal definition of fairness. Equal power, protected service and curtailment history can select different outcomes.

Allocating Limited Transformer Capacity: Define What “Fair” Means: technical review table
First article table, reproduced without adding or changing values. See the article for assumptions and application boundaries.

Separate feasibility from the allocation objective

First define electrical/thermal limits, resource availability and service requirements. Jain’s transformer-aware EV study illustrates the local equipment boundary [2]. Choose an allocation objective only within the feasible set; changing a service requirement must remain visible.

Preserve the location and phase of each resource. Equal division of a total allowance can violate the limiting phase even when the arithmetic sum is correct. Likewise, a user with a near departure deadline may need a higher interval power to receive the same completed service as someone connected overnight.

Rule consideredWhat is equalized or protectedPossible tradeoff
Equal instantaneous powerkW allocated during an intervalDifferent energy completion when availability differs
Deadline-aware serviceProgress toward the stated completion requirementA later-deadline user may wait longer
Basic-service reserveA specified minimum service before discretionary useLess capacity remains for optional requests
Curtailment-history adjustmentBurden over several eventsRequires a defined history and treatment of new participants

Use a small example with explicit requests

Consider an illustrative pair of chargers with the same power capability. One has a short remaining connection window and the other a longer window. An equal-power rule may leave the first request incomplete while the second still has unused future opportunity. A deadline-aware rule can change that outcome if the remaining transformer allowance and later intervals permit it.

The comparison should retain requested energy, availability and phase constraints. Report completed energy, unmet energy and waiting time under each rule. A favorable result obtained by reducing one customer’s request is a different service agreement, not an improvement in allocation.

Make exceptions and infeasibility reviewable

Define how overrides, failed devices, nonparticipating customers and previously curtailed users enter the rule. A minimum reserve should identify the service it protects and who approves it. Do not present one chosen fairness metric as a regulatory requirement unless the applicable rule has actually been established.

A disputed allocation should be reproducible from the requests, the selected objective and the binding transformer constraint. Preserve any request that could not be fulfilled and why. If the same shortfall persists across feasible schedules, an unexplained fairness score cannot resolve the capacity or service conflict.

References

  1. S. Alyami, Ensuring Sustainable Grid Stability through Effective EV Charging Management: A Time and Energy-Based Approach, Sustainability 16, 6149, 2024, section 3. DOI: 10.3390/su16146149.
  2. A. Jain and M. Karimi-Ghartemani, Mitigating Adverse Impacts of Increased Electric Vehicle Charging on Distribution Transformers, Energies 15, 9023, 2022. DOI: 10.3390/en15239023.