Chenfan Electric
EN
Send drawing

PROCESSManufacturing

Transformer core assembly

Stack, align and clamp the magnetic circuit to the approved geometry, with the handling method reviewed for the core mass and structure.

Transformer core assembly station

Assembly equipment

Up to 100 t per single core

Single-core capability
Up to 100 t
Handling equipment
Hydraulic tilting table
Stacking control
Stacking factor >97%

Large-core manufacturing combines stack build-up, alignment, clamping and controlled turning. Core geometry and handling access define the assembly plan.

Assembly controls

Geometry and interfaces

Clamped core assembly on support fixtures
Clamped core assembly on support fixtures

Inspection before release

Check the window, limb and yoke dimensions against the approved revision. Confirm joint alignment, clamping interfaces and the parts included in the order.

Agree winding installation access and any upper-yoke opening before production. Final transformer testing remains part of the complete transformer scope.

Quality control ↗

Define the assembled-core supply scope alongside these interfaces, including the clamping, accessories and handover condition agreed for the order.

RFQTechnical review

Confirm the processing requirement

Include the drawing or width schedule, material, quantity and packing requirement.

    Chenfan Electric

    Direct coordination

    Start a conversation.

    A drawing, a material requirement, or a project to discuss.

    Send drawing