Chenfan Electric
EN
Send drawing

PRODUCTTransformer cores

Power Transformer Cores

Power-transformer cores up to 100 t. Precision-cut laminations, pre-stacked packets or complete core assemblies — built to your drawing.

  • Up to 100 t per core
  • Multi-Step Lap
40 MVA transformer project: assembled core
40 MVA transformer project reference. Project rating identifies the transformer application.

01 / Specification

Core specification

Material
CRGO / GOES: conventional, Hi-B or laser-scribed
Steel thickness
0.18 / 0.20 / 0.23 / 0.27 / 0.30 mm
Single-core capability
Up to 100 t
Joint geometry
Multi-Step Lap to the approved lamination schedule
Cut-edge control
Burr height <0.02 mm
Assembled stack
Stacking factor >97%

Burr height and stacking factor are manufacturing controls. Order acceptance is agreed for the specified material, coating, stack condition, drawing tolerances and measurement method; these figures do not guarantee transformer loss or efficiency. Single-core capability is subject to project-specific geometry, assembly, handling and transport review.

02 / Supply

Core delivery formats

Cut CRGO laminations
Cut CRGO laminations

Delivery format

Cut laminations

Identified cut pieces for factories that build the joint, stack and clamp the core in-house.

Delivery: pieces grouped by the lamination schedule.

Lamination grouping at the pre-stacking station
Lamination grouping at the pre-stacking station

Delivery format

Pre-stacked packets

Counted lamination packets arranged in their stacking sequence for core assembly at your factory.

Delivery: identified packets with orientation and sequence retained.

Core assembly and clamping
Core assembly and clamping

Delivery format

Assembled core

The stacked magnetic circuit with the specified clamping structure, prepared for winding integration.

Delivery: core assembly with the specified accessories and handling provisions.

03 / Integration

Built for your winding and assembly process

Assembly interfaces

Window and limb dimensions, clamping, lifting and upper-yoke access are coordinated with your winding installation sequence.

Project definition

Send the drawing revision, material specification, quantity and destination. Include the required delivery format and the test conditions for any finished-core loss requirement.

Large-core supply

Set the assembly, test and transport boundaries

Geometry and winding integration
Confirm three-limb or five-limb construction, stepped sections and window dimensions. Agree the upper-yoke delivery state, any opening or removal required, and the winding installation sequence.
Clamping and accessories
List clamps, insulation interfaces, grounding parts, lifting provisions and transport supports. Inclusion and responsibility follow the approved supply scope.
Finished-core testing
State the required loss limit, frequency, flux density, excitation arrangement, core condition and reporting requirements before ordering.
Handling and shipment
Confirm the factory-release and transport orientations, actual packed dimensions and weight, restraint, lifting method and destination unloading conditions. Review any change of orientation before shipment.

The 100 t figure is single-core manufacturing capability, not a blanket shipping limit or a promise that any assembled core fits a standard container. Handling and transport feasibility are reviewed for the specific project.

The quality-control process separates material certificates from finished-core test results. See the core supply-format comparison when choosing between packets and an assembled core.

Project evidence

Large power transformer core references

125 MVA five-limb project

An assembled five-limb core with controlled geometry and lamination assembly. View the five-limb project reference.

330 kV transformer project

A three-phase core with multi-step-lap joints supplied for an EHV transformer application. View the EHV core reference.

MVA and kV identify the associated transformer project. They do not replace the core drawing, material specification or order-specific acceptance criteria.

Request a power transformer core quotation with the drawing revision, material specification, supply format, quantity, test basis and destination. The RFQ guide lists the information to confirm.

RFQTechnical review

Send your core drawing

Include the drawing revision, material specification, quantity and destination.

    Chenfan Electric

    Direct coordination

    Start a conversation.

    A drawing, a material requirement, or a project to discuss.

    Send drawing