Start the short-circuit model from the locked assembly equilibrium. Carry the assembled winding compression, retained restraint and balanced contact state into the fault step. Applying the clamp force with the fault pulse mixes installation movement with the electromagnetic response.
Build the installation state first. Transfer its deformed geometry, stress, contact status and retained constraints into the transient analysis. The decisive check is a quiet, balanced assembly before the fault begins.
Reproduce what holds the compression
Identify the physical installation sequence: where the compression fixture acts, how the stack seats, when rods or other restraints are locked, and which temporary loads are removed. A fixture-held stack and a stack held by stretched tie rods can have the same initial compression force but different incremental stiffness during a fault.
NASA’s Preloaded Joint Analysis Methodology for Space Flight Systems describes the basic mechanism: tensile preload in a bolt is balanced by compression in the connected members. Their different stiffnesses control subsequent load sharing. That equilibrium principle is useful here; the winding assembly still needs its own geometry and material laws.
For a simple elastic lock-up, let the rod stiffness be k_b, the stack stiffness k_s, and the imposed interference or closure Δ. Compatibility gives:
F₀ = Δ / (1/k_b + 1/k_s).
Assumption: With k_b = 100 MN/m, k_s = 20 MN/m and Δ = 0.60 mm, the retained force is 10 kN. The rod stretches 0.10 mm and the stack compresses 0.50 mm. Their stored energies are 0.50 J and 2.50 J, respectively. A model carrying 10 kN but zero elastic deformation does not represent this lock-up state.
Equal total force does not mean equal interface pressure
The preload also depends on seating. Consider two compression-only support paths under a common platen. Path 1 has stiffness 10 MN/m and touches initially. Path 2 has stiffness 20 MN/m but an initial gap of 0.20 mm. For platen movement u:
F₁ = k₁u; F₂ = k₂ max(u − g, 0).
At a total force of 10 kN, u is 0.4667 mm. Path 1 carries 4.667 kN and path 2 carries 5.333 kN. Dividing the load solely in proportion to stiffness would give 3.333 and 6.667 kN and miss the seating history. If the two contact areas are different, their average pressures differ again.
This small model is an assembly benchmark. In the winding model, use the actual support heights, gaps, contact areas, platen flexibility and compression curves. The rod force is one balance quantity; it is not a pressure boundary that can be assigned independently to every interface.

Transfer a state, not a load label
Use three solution stages. First close the assembly gradually with the installation fixture or equivalent displacement. Next activate the retained restraint at its correct installed length and remove the temporary fixture according to the physical sequence. Finally equilibrate the retained assembly with the fault force set to zero.
At the transfer, preserve internal material variables where the constitutive law uses them. A nonlinear compression model may retain permanent strain; frictional interfaces may retain tangential traction. Keeping only the final nodal positions while resetting these variables can release a different amount of energy when the fault starts.
Check the transferred state against four physical quantities: retained rod force, total support reaction, support compression and active contact area. Then evaluate the unconstrained nodal force residual. Reactions at constrained degrees of freedom are legitimate; a residual at a free degree of freedom is an unbalanced force.
Run a short zero-fault continuation from that state. A stationary elastic assembly with zero initial velocity should remain stationary to the numerical accuracy required for the subsequent displacement assessment. Initial ringing points to inconsistent transfer, an abruptly changed restraint or incomplete equilibrium. Fix the cause before interpreting the first fault peak.
Make the initialization independently reviewable
The assembly record should show the fixture displacement history, restraint activation stage, final locked dimensions and the pressure map immediately before fault loading. Include an energy ledger so that removal of a temporary fixture cannot silently erase or inject the stored preload energy.
Check installation compatibility alongside force balance. Reconcile the reported 10 kN clamp force with rod stretch, stack compression and contact reactions, then release a winding state with a defined load path and balanced contacts.
IEC 60076-5 addresses thermal and dynamic withstand of external short circuits. The support model and its validation should resolve the mechanical quantity used in that assessment. [1]
Retained preload and joint stiffness determine how a clamped load path responds and when compression is relieved. [2]
References
[1] IEC, IEC 60076-5:2006, Power transformers — Part 5: Ability to withstand short circuit.
[2] Jeffrey A. Chambers, NASA, Preloaded Joint Analysis Methodology for Space Flight Systems, NASA TM-106943, December 1995.