Sensor drift and GIC both appear as slow components in a neutral-current record. Baseline correction therefore needs independent zero evidence. Preserve the raw signal and establish which part of the offset belongs to the instrument before applying the correction. [1] [2]
Bailey and colleagues found limitations when comparing modeled and measured slow variation. Their discussion also distinguishes signal-range problems and power-system features. It does not justify treating every quiet-period trend as removable sensor drift.

Identify the offset independently
Represent a measured channel as y(t) = g(t)I(t) + b(t) + ε(t), where I is the physical current, g the gain, b the offset and ε the remaining error. From y alone, an unknown slowly varying I and an unknown slowly varying b cannot generally be separated.
A verified zero-current measurement, an independently characterized reference channel or a documented calibration can constrain b. Calling a period geomagnetically quiet does not verify zero current: other DC sources, network changes or weak geomagnetic inputs may remain.
| Evidence available | Permitted interpretation | Correction boundary |
|---|---|---|
| Verified zero measurement | Observed output estimates offset at that time | Interpolation requires demonstrated stability |
| Repeated controlled temperature characterization | A reproducible instrumental dependence may be estimated | Do not transfer an unsupported laboratory fit into every field condition |
| Independent current channel | Agreement or disagreement constrains candidate drift | Check common-mode errors and channel bandwidth |
| Slow trend in one channel only | Cause remains ambiguous | Retain an uncertainty interval instead of deleting it as fact |
Preserve raw data and correction provenance
Keep the original samples, calibration history and environmental channels. Save the estimated offset as a separate series so the corrected record can be reconstructed. Flag sensor replacement, power interruptions, range changes and software updates as possible discontinuities.
A correction fitted across a step can spread that step into an artificial long ramp. Segment the record at supported instrument changes, then state what constrains each segment. Avoid stitching independent pieces merely to make their means match.
High-pass filtering may serve a deliberately limited comparison of faster variations. Report its transfer function and the excluded frequency range. Do not label the filtered output as the complete transformer DC excitation when relevant slower components have been removed.
Carry unresolved drift into the engineering result
If the credible offset lies in an interval, propagate that interval through the neutral-to-winding conversion and any subsequent transformer assessment. A single corrected line can conceal uncertainty in both magnitude and sign.
Compare the event under the raw record, supported correction and plausible offset bounds. If its magnitude depends on an unverified baseline fit, retain the interval and obtain independent zero evidence for the magnetic assessment.
References
- R. L. Bailey and coauthors, Modelling geomagnetically induced currents in midlatitude Central Europe using a thin-sheet approach, Annales Geophysicae 35, 2017. DOI: 10.5194/angeo-35-751-2017.
- B. N. Taylor and C. E. Kuyatt, NIST Technical Note 1297, Guidelines for Evaluating and Expressing the Uncertainty of NIST Measurement Results, 1994, sections 5 and 6.

