Mobile transformer grounding crosses the tank, trailer, deployed supports, cable screens, neutral equipment and site structures. Map their conductive interfaces and fault-current paths as one installed configuration, including transferred potential beyond the trailer. IEEE 80 addresses AC substation grounding; apply the project’s applicable grounding design basis to this installed arrangement. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Map conductive interfaces at the deployed site
Use the actual bonding and grounding design to identify each interface. Wheels, jacks or incidental metal contact should not be assumed to provide the intended electrical connection. Mechanical support and protective bonding have different functions, and a flexible or removable mechanical joint may not establish a reliable current path.
| Interface | Path to establish from the design | Potential issue |
|---|---|---|
| Tank to trailer or operating base | Specified bonding connection across the mechanical interface | Incidental contact mistaken for the defined bond |
| Deployed jacks and outriggers | Relationship to the equipotential zone and frame | Accessible metal at a different potential |
| Cable screens and termination supports | Screen bonding, earth return and conductive structure paths | Remote-site potential transferred through a cable |
| Neutral equipment | Actual neutral connection and fault return path | Grounding assumptions incompatible with the selected transformer mode |
| Nearby fences, services and temporary auxiliaries | Connection or separation from the local zone | An external conductive path crosses the potential boundary |
Follow transferred potential beyond the trailer
A bonded cable screen can connect the temporary installation to a remote grounding system. A person may encounter two structures whose potentials rise differently during a fault. The interface review must therefore identify which conductors leave the local equipotential region and where they terminate.
Do not infer touch or step performance from one measured earth resistance. Fault current distribution, clearing time, soil and site geometry influence those quantities. A complete site grounding study may be required, but the mobile-unit interface drawing still needs to provide the actual conductive paths and connection points for that study.
Recheck the interfaces after deployment changes
Changing from trailer operation to a detached base, adding a cooler skid or relocating auxiliary equipment can introduce new accessible metal and different paths. Review each changed interface against the applicable site design. The previous site’s bonding arrangement cannot be inherited solely because the same transformer has arrived.
Verify specified bonds and identify intentional separations using the authorized methods for the installation. Resolve conflicts between corrosion isolation and electrical bonding through coordinated design; removing a required protective connection is not a generic solution.
Give the site grounding designer a complete map of conductive interfaces, specified bonds and external paths. Recheck that map when supports, cables or neutral equipment change during deployment.
Keep bond loss separate from touch-voltage acceptance
Coordinate material isolation with the required electrical path; the galvanic design must account for the complete conductive couple [2].
Assume a defined bond carries 1,000 A RMS for 0.20 s and has 2 mΩ resistance at the event temperature. Its resistive drop is 2 V and deposited energy is 400 J. A 10 mΩ alternative gives 10 V and 2,000 J. This comparison can select a bond for further assessment; site touch and step voltage still require the complete grounding model.
References
- IEEE, IEEE Std 80-2013, IEEE Guide for Safety in AC Substation Grounding, incorporating Cor 1-2015.
- U.S. Department of Defense, MIL-STD-889D, Galvanic Compatibility of Electrically Conductive Materials, 21 July 2021, sections 5.5 and 5.8 and Appendix C.2.8 and C.2.13.