Plan short-lamination capacity from the complete stop-to-cut cycle. The strip accelerates, travels the advance, decelerates and completes the required hold before the next feed; a short piece can finish its motion below the rated velocity ceiling.
Calculation basis. Unless a value is explicitly attributed to a cited source, numerical inputs in the demonstrations are assumptions for the stated model. Normalized variables are dimensionless. The examples define their own geometry, excitation and measurement boundary.
Identify the installed machine architecture first. The model below starts and ends every feed at rest and adds a nonoverlapping hold interval. Use a separate sequence model for flying shears, moving-strip cutting or overlapped operations.
Separate motion constraints from the speed headline
The original WPILib motion-profile documentation treats maximum velocity, maximum acceleration, and starting/ending position and velocity as separate inputs. Those are general motion-control concepts, not CRGO-line performance evidence. Beckhoff’s original dynamic-characteristics documentation also distinguishes acceleration profiles and identifies a step-shaped acceleration option without jerk limitation. Its trapezoidal acceleration profile must not be confused with a trapezoidal velocity profile.
For a deliberately simplified derivation, let feed distance be L, maximum velocity be v, and equal acceleration/deceleration magnitude be a. Assume ideal step changes in acceleration, zero velocity at both ends and no cruise-speed overshoot. These assumptions exclude finite jerk, tracking error, strip slip and mechanical settling.
Accelerating to v takes v/a seconds and covers v²/(2a). Deceleration requires the same distance. Therefore the minimum advance that can reach v is L* = v²/a. Below that distance, the fastest ideal velocity trace is triangular: acceleration changes directly to deceleration with no cruise interval.
For L below L*, the peak velocity is √(aL), and feed time is t_feed = 2√(L/a). For L at or above L*, it is t_feed = L/v + v/a. The formulas join continuously at L*: both give 2v/a. They are analytical times under the declared ideal constraints, not measured servo performance or a qualified cycle setting.
Add the work that cannot overlap feeding
Under this model, t_cycle = t_feed + t_hold. Define the hold interval using actual event boundaries: feed reaches its required stop condition, then any required settling, interlock verification, cut and release operations complete before the next feed begins.
Do not add operations twice if they overlap, and do not remove them because their durations are absent from a speed brochure. For an actual machine, reconstruct the sequence from its permitted operation and time-stamped signals. A knife command, completion signal and permission to feed can refer to different events. The model’s hold is a combined illustrative interval, not a claim that those events always occur serially.
Compare two lengths with the same velocity ceiling
Suppose v = 2.0 m/s, a = 4.0 m/s² and t_hold = 0.120 s for every piece. These are assumed conditions, not equipment ratings. The transition distance is 1.0 m.
A 0.10 m advance is triangular. It reaches only √0.4 = 0.632 m/s, feeds in 0.316 s and takes 0.436 s including the hold. The simple L/v estimate is 0.050 s, even before accounting for cutting or waiting.
A 2.00 m advance reaches 2.0 m/s. It takes 0.500 s to accelerate, 0.500 s to cruise and 0.500 s to decelerate. Feed time is 1.500 s and cycle time is 1.620 s. Its L/v estimate is 1.000 s. The missing acceleration/deceleration allowance is proportionally more important for the short piece.

| Advance | Ideal profile | Feed time, s | Hold, s | Modeled cycle, s |
|---|---|---|---|---|
| 0.10 m | Triangular | 0.316 | 0.120 | 0.436 |
| 1.00 m | Transition, no cruise plateau | 1.000 | 0.120 | 1.120 |
| 2.00 m | Trapezoidal velocity | 1.500 | 0.120 | 1.620 |
Increasing only the velocity ceiling above 2.0 m/s cannot shorten the ideal 0.10 m feed under the same acceleration and rest-to-rest conditions: that feed already peaks below the ceiling. This is a statement about the model, not permission to change acceleration, cut timing or machine limits.
Sum cycles for the actual length mix
For five 0.10 m pieces and five 2.00 m pieces, the modeled time is 5 × 0.4362278 + 5 × 1.620 = 10.281 s. Total advance is 10.5 m. Dividing that advance by 2.0 m/s gives 5.250 s, which omits both the repeated motion penalties and all ten hold intervals.
Average the time contribution of each piece, then divide the number of pieces by total time if a pieces-per-time result is needed. Do not average the reciprocals of individual cycle times without the correct weighting; that would answer a different question.
In this stripped-down example, reordering the same ten pieces does not change the sum. Real mixed recipes can have additional sequence effects from tool selection, angle changes, strip handling or downstream restrictions. Add verified sequence-dependent times explicitly. A claim that long/short mixing itself improves throughput needs evidence beyond this independent-cycle model.
Establish the minimum stable production cycle
The ideal profile is a reference for timing, not an acceptance test. A shorter command sequence is useful only if dimensions, edge condition, release identity and downstream transfer remain acceptable under the approved process. Position being commanded correctly is different from the strip reaching and retaining its required position.
For a qualification run, record commanded advance, feed-start and stop events, cut completion, next-feed permission, actual dimensional results, interruptions and accepted output count. Include short pieces and representative mixed sequences. Report the distribution of observed cycles and the conditions producing unusually long or rejected cycles rather than presenting one fastest cycle as sustainable capacity.
Build the operating model from measured feed and hold events, accepted output and representative mixed recipes. Include changeovers and order-level delays in the capacity forecast. The resulting cycle states how repeatedly the approved sequence delivers the required short lamination under verified conditions.
Convert the mixed recipe into a material throughput ceiling
For the catalog 0.23 mm sheet and 7,650 kg/m³ density, assume a constant 100 mm strip width. [1] The stated mixed recipe advances 10.5 m and therefore handles 1.847475 kg of steel. Its ideal motion-and-hold time is 10.281139 s, giving 646.904 kg/h before changeovers, rejects or interruptions. Using only length divided by 2.0 m/s gives 5.250 s and 1266.840 kg/h, 95.83% higher. Retain feed acceleration and every hold in the capacity calculation before converting accepted pieces into a delivery forecast.
Control strip gauge and width, commanded advance, acceleration, cut-completion permission and stacking transfer. Dimensional acceptance, burr condition and accepted output count determine usable throughput; a line-speed setting alone does not. IEC 60404-8-7 provides the delivery-specification framework for fully processed grain-oriented steel. [2]
References
[1] Cleveland-Cliffs, Grain-Oriented Electrical Steels — LITE CARLITE and Mill-Anneal, October 2023, Tables 1 and 5; Stress-Relief Annealing.
[2] IEC, IEC 60404-8-7:2020, Magnetic materials — Part 8-7: Specifications for individual materials — Cold-rolled grain-oriented electrical steel strip and sheet delivered in the fully-processed state.