Winding temperature changes DC resistance and the allocation of GIC through the network. Use the conductor’s DC resistance at the relevant temperature for each identified winding section, then solve the resulting current distribution. [1]
Use the actual galvanic connection. In an autotransformer, the series and common resistances connect different network nodes. Combining them into one resistance can remove the low-voltage terminal path before temperature correction even begins.

Correct one identified resistance at a time
A local linear material approximation is R2 = R1[1 + α1(θ2 − θ1)]. R is ohms, θ is temperature in degrees Celsius with differences in kelvins, and α1 is the resistance temperature coefficient at the reference temperature in reciprocal kelvins. Use a relation appropriate to the conductor material and temperature range.
Use the USBR copper correction constant 234.5 °C [2]. Assumptions: 0.1000 Ω at 20 °C and a winding at 80 °C. R80 = 0.1000 × (234.5 + 80)/(234.5 + 20) = 0.123576 Ω, a 23.58% increase. Assign this corrected resistance to its identified branch, then solve the whole connected DC network rather than scaling only one current. [1]
| DC network element | Temperature/reference evidence | Correction boundary |
|---|---|---|
| Series winding | Its measured resistance and conductor temperature | Keep its high-to-low terminal connection |
| Common winding | Its own resistance and thermal state | Keep its low-terminal-to-neutral connection |
| Neutral lead or connection | Material, geometry and relevant temperature | Do not silently include it twice |
| Station grounding equivalent | Grounding measurement/model basis | Do not apply winding-metal correction indiscriminately |
Reconcile terminal measurements with branch resistances
A line-to-line DC resistance measurement can include more than one winding section or parallel paths. Convert it through the actual connection before assigning a phase resistance. Tap position, leads and parallel conductors also belong in that reconciliation.
Keep the temperature evidence appropriate to the measured metal. Bulk oil temperature is not automatically the winding’s average temperature, and a local hot spot is not automatically the resistance-weighted mean. Use the operating-state estimate justified for the DC path and retain its uncertainty.
Recalculate the whole current allocation
Complete an independent network fixture: assume a 1 V source, a shared 0.20 Ω series ground return, and two parallel winding branches. The first is the corrected copper path; the second stays at an assumed 0.20 Ω. Cold branch currents are 2.500/1.250 A. With the first winding at 80 °C they become 2.2364/1.3818 A, since the shared-node voltage also changes. Replace both currents in the equipment assessment; reducing only the first by its resistance ratio misses that redistribution.
A warm-winding scenario and a cold-winding scenario can bound part of the allocation uncertainty. Keep the source driving voltages, topology and grounding assumptions comparable so the difference actually tests temperature correction.
Record the reference resistance, temperature correction and winding-section identity used in the DC network. Carry the resulting currents into the magnetic and thermal assessment with the operating-temperature assumptions intact. [3]
References
- R. L. Bailey and coauthors, Modelling geomagnetically induced currents in midlatitude Central Europe using a thin-sheet approach, Annales Geophysicae 35, 2017. DOI: 10.5194/angeo-35-751-2017.
- U.S. Bureau of Reclamation, FIST Volume 3-31, Transformer Diagnostics, June 2003.
- NERC, Transformer Thermal Impact Assessment White Paper, Project 2013-03 Geomagnetic Disturbance Mitigation, October 2017.