Chenfan Electric
EN
Send drawing

ARTICLETechnical article

Petersen-Coil Detuning after Feeder State Changes

  • Chenfan Power

A feeder switching operation changes the network earth capacitance. The existing Petersen-coil position can then leave the newly connected network detuned. Calculate the new capacitive current and compare it with the coil’s available compensation range. [1] [2]

Define the detuning sign explicitly. Manufacturers and studies can use different conventions. A percentage without its numerator, denominator and sign is insufficient for comparing results.

Petersen-Coil Detuning after Feeder State Changes: technical review table
Use one sign convention across the state map

Use one sign convention across the state map

Define absolute mismatch as ΔI = IL − IC and relative detuning as v = (IL − IC)/IC. Positive v denotes overcompensation and negative v denotes undercompensation. IL and IC are compensating inductive and network capacitive currents in amperes at a common stated neutral voltage and frequency. v is dimensionless; multiply by 100 for percent.

In a simple lumped network, IC = ωCΣU, where CΣ is the aggregate phase-to-earth capacitance in farads, ω is radians per second and U is the assumed displacement-voltage magnitude in volts. This convention uses total aggregate capacitance. Do not insert a per-phase capacitance without its corresponding three-phase factor.

Illustrative feeder stateICUnchanged ILAbsolute mismatchRelative detuning
Original connected feeders100 A110 A+10 A+10.00%
Additional feeder connected120 A110 A−10 A−8.33%

All numerical inputs in this comparison are assumptions; voltage and frequency remain fixed. The same 10 A mismatch has different percentage magnitude because the denominator changes. These two rows do not establish a permissible setting.

Recalculate capacitance by connected state

Maintain a feeder inventory with earth-capacitance data and uncertainty. Cable length alone is insufficient when construction, sheath arrangement or installed equipment differs. Include bus equipment and other connected capacitances within the model boundary.

For interconnected sections, account for all coils in the connected area as well as the total capacitance. Where a grounding transformer lies in series with the coil, include its relevant zero-sequence port impedance rather than using the coil’s marked current alone.

Separate the first mismatch from the retuned result

For every topology change, record the immediate mismatch at the old position, the controller’s detected state, travel toward the new target and the settled mismatch. The network may change again during that travel. A final position from a successful earlier tuning attempt cannot establish the intermediate conditions.

Map the largest and smallest credible connected capacitance against the available effective compensation range. Use tolerance and unavailable-coil cases to reveal state combinations outside that range.

Record detuning in amperes and percent with one consistent sign convention. Identify the feeder states that exceed the available coil range and resolve those gaps in the equipment or operating plan.

References

  1. A. Eberle GmbH & Co. KG, The Petersen-Coil Regulator, REG-DP/REG-DPA, including Current Injection and High Power Current Injection, Operating Instructions, April 2017.
  2. Q. Yang, B. Zhang, J. Ran, S. Chen, Y. He and J. Sun, Measurement of Line-to-Ground Capacitance in Distribution Network Considering Magnetizing Impedance’s Frequency Characteristic, Energies 10, 2017. DOI: 10.3390/en10040477.
Chenfan Electric

Direct coordination

Start a conversation.

A drawing, a material requirement, or a project to discuss.

Send drawing