Earth-fault current creates a short-time mechanical excitation different from the grounding transformer’s no-load sound duty. Capture the section-current waveform, leakage-field excitation and clamping response on one synchronized event record. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.
Separate continuous service noise from short-time structural response. Sound pressure at a microphone describes an acoustic field; acceleration at an identified support describes local motion. Neither quantity automatically establishes movement of an internal winding.

Relate excitation to the actual current waveform
Under a simplified linear geometry, the leakage field driven by a section current scales with that current, and electromagnetic force can scale approximately with i². For i = Ipeak sin(ωt), i² = Ipeak²[1 − cos(2ωt)]/2. Ipeak is amperes, ω is radians per second and t is seconds. The squared current contains a constant component and a component at twice the current frequency.
A decaying offset adds other force-history terms, including a cross term with the alternating current. The first cycles can therefore differ from the settled periodic response. Use the section-current waveform, not only the stated symmetrical RMS neutral current, when explaining the excitation.
Actual force direction and location depend on winding geometry, local leakage field and support arrangement. A twice-frequency peak in the acoustic spectrum is consistent with several mechanisms; it is not a unique diagnosis of a loose winding.
Build one aligned event record
| Record | Location or identity | Interpretation purpose |
|---|---|---|
| Phase and neutral currents | Defined CT positions and reference directions | Identify electrical duty and reconstruct eligible section currents |
| Local acceleration | Named tank, support or accessible structural point | Compare onset, frequency content and post-event decay |
| Acoustic pressure | Microphone position and environment | Separate event sound from background and reflections |
| Switch and clearing timestamps | Common time base | Distinguish energized forcing from free mechanical decay |
| Inspection and condition evidence | Identified joint or support | Test a proposed physical explanation |
Record instrumentation bandwidth, mounting, clipping and synchronization uncertainty. A sensor that saturates during the event can understate the peak while still producing a plausible spectrum. A microphone in a reflective enclosure can exaggerate a room response rather than the equipment source.
Compare the forced interval with the decay
During the fault, compare electrical forcing with local response. After clearing, look for free-decay components, changes in baseline vibration and repeatable shifts between otherwise comparable events. A persistent change can justify targeted inspection, but a waveform alone does not identify which clamp or winding moved.
Keep fault magnitude, offset, initial temperature and support condition attached to every comparison. Repeating a test at a different current cannot establish a mechanical change without accounting for the excitation difference.
Align electrical and mechanical traces, identify the sensor locations and compare events at matched excitation and support conditions. Use the record to distinguish forced motion during the fault from structural decay after clearing.
Normalize the vibration comparison to force
Specify the earthing-transformer function and its test boundary under the applicable reactor standard [2].
For an assumed unchanged linear geometry at 50 Hz, increasing symmetrical current from 200 A RMS to 250 A RMS increases the current-squared forcing scale by (250/200)² = 1.5625, or 56.25%. Its periodic force component is at 100 Hz. Compare acceleration after this excitation normalization; a larger acceleration alone cannot establish a changed clamp condition.
References
- D. De Ronde, R. VanHatten and A. Wade, Loss of Effective System Grounding — Best Practices, Protection Challenges, and Solutions, Schweitzer Engineering Laboratories, 2015.