A grounding transformer provides the intended zero-sequence path only through a complete phase-feeder, internal-winding and neutral circuit. Track those conditions against each bus island and switching state to establish effective grounding availability. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.
For a sectioned bus, begin with its electrically connected islands. Then establish which serviceable grounding units actually connect to each island. This separates the coverage question from the operating sequence used to change bus states.

Define availability at the transformer
Use three distinct conditions. M means the required phase-terminal connection to the bus is intact. N means the intended neutral return is intact. D means the transformer and necessary internal paths are available for the assessed duty. A simple logical availability condition is A = M AND N AND D.
The predicate is an analytical definition, not a ready-made interlock. D may require more than an absence of alarms. A closed-delta design with a defective loop, a zigzag section problem or an unresolved thermal restriction can fail the intended duty while auxiliary control power and neutral monitoring remain present.
| Transformer condition | What an apparently healthy signal can miss | Coverage consequence |
|---|---|---|
| Neutral intact; phase feeder open | Neutral monitor may still see its local circuit | No intended bus grounding through that unit |
| Feeder reported closed; one phase path interrupted | One general position indication may not prove all phase continuity | Specified symmetrical zero-sequence function not established |
| Phase and neutral paths intact; internal path restricted | Terminal connectivity does not establish internal readiness | Duty availability remains conditional |
| Auxiliary side energized; main bus connection absent | Voltage presence can arise at a different port | Do not infer main-bus coverage from that voltage alone |
Apply the predicate to bus islands
Represent bus sections and closed couplers as a connectivity graph. A grounding unit covers an island only when it is connected to that island and its availability predicate is satisfied. With two isolated sections, a unit on section A does not cover section B. When a coupler joins the sections, one available unit may be reachable from both.
After enumerating the bus graph, calculate the relevant zero-sequence network for each covered island. Logical reachability establishes a path’s presence; it does not establish that its impedance, fault duration or protection coordination is acceptable.
Give each unavailable interval a physical cause
Mark the time when M, N or D changes, using the appropriate device evidence. The interval begins with the loss of an effective required condition, not necessarily when a supervisory display updates. Distinguish unknown state from confirmed continuity. Delayed indications can otherwise create a falsely continuous coverage trace.
Test coverage after separating the bus
Specify the earthing-transformer function and its test boundary under the applicable reactor standard [2].
Assume two bus sections with one available grounding unit connected only to section A. With the coupler closed, the connected island has one reachable unit. Opening the coupler creates two islands, of which only one is covered: coverage falls from 100% to 50% by island count. This count identifies the uncovered island; impedance and protection adequacy remain separate checks.
References
- D. De Ronde, R. VanHatten and A. Wade, Loss of Effective System Grounding — Best Practices, Protection Challenges, and Solutions, Schweitzer Engineering Laboratories, 2015.
- IEC, IEC 60076-6:2007, Power transformers — Part 6: Reactors.