Repeated earth faults carry retained heat into the next event. Track each fault, cooling interval and starting temperature on one thermal timeline. That exposes the duty created by closely spaced events and the recovery available between them. [1]

Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Define the earthing-transformer test boundary separately [2]. The first task is to preserve the event order. Record fault-current waveforms, clearing times, intervals, pre-existing auxiliary load and cooling conditions. Events with the same nominal current and duration may still have different heating because their offsets, section-current distributions or initial temperatures differ.

Tracking Grounding Transformer Temperature through Repeated Faults: technical review table
Plot three events on one temperature ledger

Carry the thermal state across the gap

A simple screening model treats one relevant thermal region as a lumped node. Let x be its temperature rise above the equilibrium produced by the continuing background duty. During a gap with that duty unchanged, x decays as x(t) = xstart exp(−t/τ). Time t and thermal time constant τ are in seconds; x is in kelvins.

If a brief fault adds an adiabatic increment Δθk, then xk+ = xk− + Δθk. The next pre-fault state is x(k+1)− = xk+ exp(−Δtk/τ), where Δtk is the interval between faults. Plus and minus identify the states just after and just before a pulse; they do not describe current polarity.

This recurrence is an illustrative model. A real winding may need several thermal regions, temperature-dependent resistance and explicit heat transfer during the fault itself. Its value is that it refuses to erase the thermal memory.

Plot three events on one temperature ledger

Assume, purely illustratively, a 10 K increment per short fault, a 600 s time constant and a 60 s gap. The retained fraction between events is exp(−60/600) ≈ 0.9048. Starting with no extra temperature rise above the background equilibrium gives the following trajectory.

EventExtra rise immediately beforeExtra rise immediately after
First fault0 K10.00 K
Second fault9.05 K19.05 K
Third fault17.24 K27.24 K

If the background equilibrium temperature were 80 °C, the illustrative post-third-fault node temperature would be 107.24 °C. That value is arithmetic, not a permissible operating temperature or a prediction for an identified transformer.

For an indefinitely repeated identical pulse and gap, this simplified model approaches a post-fault extra rise of Δθ/(1 − exp(−Δt/τ)). A finite repeated-fault specification should still use its actual event count. The mathematical limiting value is not a substitute for that specification.

Change the equilibrium when the plant changes

A fan stopping, an auxiliary load increasing or the enclosure becoming warmer invalidates the assumption that the same background equilibrium applies throughout. Update the background thermal state as well as the retained fault increment. Cooling intervals should be measured from the relevant clearing event, not from an unrelated control timestamp.

Use the event ledger to establish thermal recovery, then assess insulation, joints and winding supports for any independent damage or recovery constraint. Keep both sets of evidence with the next-event duty.

Check the limiting accumulation as well as the third event

The pulse model uses stored thermal energy and heat removal [3]; its time constant must be identified for the actual winding and cooling state.

For the assumed 10 K pulse, 600 s time constant and 60 s cooling gap, the third post-fault rise is 10 × (1 + e⁻⁰·¹ + e⁻⁰·²) = 27.24 K. Indefinite repetition approaches 10/(1 − e⁻⁰·¹) = 105.08 K above background. Use the specified finite event sequence; the large separation shows why a three-event result cannot qualify unlimited repetition.

References

  1. D. De Ronde, R. VanHatten and A. Wade, Loss of Effective System Grounding — Best Practices, Protection Challenges, and Solutions, Schweitzer Engineering Laboratories, 2015.
  2. IEC, IEC 60076-6:2007, Power transformers — Part 6: Reactors.
  3. U.S. Department of Energy, DOE-HDBK-1012/2-92, Thermodynamics, Heat Transfer, and Fluid Flow, Volume 2, 1992.