Plan cable termination geometry before a mobile transformer reaches the site. Terminal direction, connector orientation, bend space, screen continuity and support loads determine whether the voltage-rated cable fits the actual deployment. FEMA’s transformer guidance specifically identifies supports and loads from attached service lines as assessment items. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Build the installation envelope from actual parts
Start with terminal coordinates and their defined viewing orientation. Include the proposed connector or termination body, insertion space where relevant, cable exit direction and manufacturer-specified bending constraints. Add support positions, grounded structures and the electrical clearance envelope.
| Geometric input | Interface check | Consequence of omission |
|---|---|---|
| Terminal orientation | Phase identity and mating direction in the same coordinate system | A physically reachable connection with incorrect allocation |
| Termination body | Body, stress-control and assembly space | Cable rating accepted despite insufficient termination space |
| Cable route | Actual bend limits, approach angle and adjacent obstacles | A forced bend or unintended loading at the terminal |
| Support arrangement | Gravity, cable tension and movement carried by defined supports | Bushing or connector becomes an unintended structural support |
| Grounding and screening | Screen leads, bonding points and conductive supports | Electrical identity is correct but the earth path is incomplete |
Evaluate force as well as reach
For an illustrative static lever calculation, an unsupported cable load of 200 N with a perpendicular lever arm of 0.5 m about a terminal produces a 100 N·m moment. This is not an allowable terminal load. It demonstrates why a connection that geometrically reaches the terminal may still need a different support arrangement.
Include cable stiffness, tension, thermal movement and any trailer or foundation motion in the applicable mechanical assessment. A flexible cable is not force-free, and adding a support can change where movement is absorbed. The support design must match the terminal’s specified load boundary.
Preserve phase and reference identity
Compare the site terminal view with the mobile unit’s view from an explicitly declared direction. Physical left-to-right order can reverse when two drawings are viewed from opposite ends. Preserve phase labels and verify the end-to-end allocation using the approved installation evidence.
For a fleet spare, retain site-specific adapters and support pieces as part of the interface package. Their presence, rating and geometry determine whether the nominally compatible cable can actually be installed. An adapter can also change field grading, load path or screen continuity, so it needs more than a matching bolt pattern.
Show the termination envelope, cable bends and load-reaction points on the deployment drawing. Package the matching adapters and supports with the spare so installation starts with the required interfaces in place.
Relate terminal reach to the support moment
Keep the support and cable interface with the actual mobile package [2].
The assumed 200 N cable reaction at a 0.50 m perpendicular arm gives 100 N·m. Moving the independent cable support so the residual arm is assumed 0.20 m reduces that component to 40 N·m, a 60% reduction. Compare the complete force-and-moment envelope with the terminal manufacturer’s allowable boundary.
References
- FEMA and Applied Technology Council, FEMA E-74, Reducing the Risks of Nonstructural Earthquake Damage—A Practical Guide, December 2012, section 6.4.7.3, Transformers.
- U.S. Department of Energy, Benefits of Using Mobile Transformers and Mobile Substations for Rapidly Restoring Electrical Service, August 2006, sections 2.1.4 and 2.2.1–2.2.2.