Partly deployed radiators give a mobile transformer a different thermal configuration. Establish its rating from the connected oil paths, fan airflow, hydraulic restrictions and loss distribution of that arrangement. Record the exact cooler state beside the supported duty. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Identify the deployed cooling circuit
Record which banks are connected, their physical orientation, the actual fan arrangement and the applicable pump or natural-circulation paths. Distinguish a disconnected bank from a connected bank that is poorly exposed to air. Folded geometry can alter both the external flow and the internal hydraulic boundary.
| Deployment condition | Boundary that changes | Evidence needed before using a rating |
|---|---|---|
| All approved banks deployed | Reference oil and air paths | Thermal evidence for this arrangement and ambient boundary |
| One bank unavailable | Parallel hydraulic paths and effective heat-transfer area | Validated partial-deployment configuration |
| Banks folded or closely spaced | Air recirculation and surface exposure | Evidence matching the actual deployed geometry |
| Fan group unavailable | Airflow distribution and auxiliary state | Supported degraded-cooling envelope |
| Temporary connecting pipes | Pressure drop, elevation and circulation route | Actual connection dimensions and flow compatibility |
Calculate duty from the complete cooling arrangement
Removing a parallel cooling path changes resistance and the flow division among remaining paths. Air recirculation can make added surface area less effective than its nominal area suggests. Winding hotspots may respond differently from average liquid temperature, especially where the altered flow distribution affects a specific region.
Use applicable pressure-drop and flow evidence to check the assembled liquid circuit. For air cooling, define inlet temperature at the cooler and nearby obstructions rather than relying on a distant ambient reading. A mobile installation can place intake and discharge regions close enough for recirculation to matter.
Connect the configuration to an approved thermal envelope
Request a rating or operating boundary supported for the identified deployment state, with its voltage mode, load, ambient and auxiliary conditions. If the state is not covered, it remains an evidence gap. A field estimate based on the fraction of installed radiators is not an approved derating method.
Include transient duration and starting temperature where a temporary duty is being assessed. A short deployment does not eliminate heat accumulation, and a cool initial bulk temperature does not establish the winding hotspot trajectory.
Pair each deployment state with its approved cooler arrangement, thermal evidence and rating. Resolve changes to banks, fans or piping before assigning the temporary duty.
Screen the loss budget for a partial cooler arrangement
Tie cooling-system condition and operation to the proposed deployed state [2].
Assume a hypothetical partial-cooling state can reject 70 kW at the specified ambient, with 10 kW no-load loss and 80 kW rated load loss at the reference winding temperature. With load loss proportional to K², 10 + 80K² ≤ 70 gives K ≤ 0.866. This preliminary 86.6% load screen still needs hotspot and oil-flow validation for that exact deployment.
References
- U.S. Department of Energy, DOE-HDBK-1012/2-92, Thermodynamics, Heat Transfer, and Fluid Flow, Volume 2, 1992.
- U.S. Bureau of Reclamation, FIST Volume 3-30, Transformer Maintenance, 2000.