Phase-shifter factory data become usable in load flow when bases, ports and tap references travel with the values. Verify physical impedance and complex-angle convention to validate the model against measured terminal behavior. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Map measurements to model quantities
Establish named sending and receiving terminals, phase sequence, current directions and voltage references before converting data. Identify whether the measured ratio relates line voltages, phase voltages or an internal winding pair. A two-unit assembly may require a terminal equivalent that cannot be reconstructed from one unit’s nameplate alone.
| Factory record | Model destination | Conversion or verification |
|---|---|---|
| Terminal ratio and phase displacement at an identified tap | Complex tap magnitude and angle | Translate terminal references and software sign; retain the original phasors |
| Short-circuit test with stated energized and shorted terminals | Equivalent series resistance and reactance | Preserve test boundary, frequency, temperature and electrical base |
| No-load loss and excitation current | Appropriate shunt representation | Check whether the test covers the complete assembly or one magnetic unit |
| Connection and switch-state drawing | Topology and available tap states | Confirm which measured states are actually represented |
Convert the base without changing the physical impedance
For compatible three-phase bases, znew = zold(Snew/Sold)(Vold/Vnew)². The voltages are line-to-line base values, and the power bases are three-phase apparent powers. Both bases must refer to the same side of the equivalent circuit.
In an illustrative calculation, 0.12 per unit on 100 MVA and 220 kV corresponds to 58.08 ohms. On 200 MVA and 230 kV, the impedance base is 264.5 ohms, so the same physical impedance becomes 0.21958 per unit. Retaining 0.12 would silently change the modeled device. This conversion does not reveal the resistance/reactance split or an unmeasured tap dependence.
Separate fitting from validation
Use a documented subset of measurements to derive parameters, then compare the model with additional measured states where available. Check no-load complex ratio at both angle directions, an intermediate tap and relevant extreme states. Verify current, voltage and power signs with a deliberately simple network before interpreting a large-system flow change.
Set comparison criteria from measurement uncertainty and the study purpose. A terminal load-flow model may reproduce fundamental-frequency measurements while remaining unsuitable for internal faults or fast transients. Missing design data should appear as an explicit limitation, rather than as plausible-looking winding parameters.
If a mismatch appears only after base conversion, first recover the physical ohmic quantity. If magnitude agrees but angle reverses, examine reference orientation and complex-tap convention. These two checks often separate a transcription problem from a model whose topology is inadequate.
Validate the factory tap angle against a network calculation
Tie the model and acceptance evidence to the specific PST application and tested configuration [2].
Assume equal 1.0 per-unit terminal magnitudes, X = 0.20 per unit and a measured signed PST angle of 5° opposing a 15° system angle. The simple lossless screen gives P = sin(15° − 5°)/0.20 = 0.86824 per unit. Reversing the tap sign gives sin20°/0.20 = 1.71010 per unit. Resolve a sign mismatch before tuning the full load-flow model.
References
- B. Cook, M. J. Thompson, K. Garg and M. Malichkar, Phase-Shifting Transformer Control and Protection Settings Verification, 2018. DOI: 10.1109/CPRE.2018.8349815.
- IEC, IEC 62032:2012, Guide for the Application, Specification and Testing of Phase-Shifting Transformers.

