Coordinating two phase shifters requires a coupled map from control states to monitored flows. Include cross-responses and wider branch constraints to find a feasible combination in the meshed corridor. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.
Define the control coordinates, angle signs and monitored power directions. A sensitivity in MW per electrical degree must retain that basis. It is different from a derivative per radian and can change with topology and operating point.

Build the local sensitivity matrix
For a restricted local linearization, ΔP = SΔu, where u contains the two declared phase-control coordinates. Assume, illustratively, S = [[8, −3], [−2, 6]] MW/degree for two selected monitored flows. The coordinates and numbers are invented study inputs, not device or grid data.
The first control changes both flows, and so does the second. For targets ΔP1 = −10 MW and ΔP2 = +5 MW, the linear solution is Δu1 = −1.071° and Δu2 = +0.476°. Substitution gives the stated target changes within this assumed model.
| Study layer | Evidence to examine | Interaction or limit |
|---|---|---|
| Control/measurement references | Actual angle and power signs | Wrong sign makes a corrective action adverse |
| Local sensitivity | Perturbation or validated model at the base state | Off-diagonal response couples the controllers |
| Other monitored branches | Their sensitivity to both controls | Meeting two targets can worsen a third constraint |
| Device envelope | Tap range, internal current and permitted duty | Algebraic solution may not be executable |
| Time response | Command completion, telemetry and controller delays | Each loop can respond to the other before settling |
| Contingency states | Recomputed topology and sensitivity | A base-case matrix may not cover line outages |
Check feasibility before accepting the solution
A matrix inversion answers only the local linear equations. It does not establish voltage, branch-current or internal component compliance. Quantized taps also differ from continuous controls; the feasible discrete combination may not hit both targets exactly.
If the response matrix is nearly singular, small measurement or model errors can produce large calculated actions. Use appropriate conditioning and uncertainty analysis instead of accepting every invertible matrix as a consistent controller basis.
Compare local targets with the network objective
A target pair can conflict with the corridor’s wider security or loss objective. Include the relevant other constraints and credible system states in the optimization or coordination study. Independently reaching each selected flow does not prove a global optimum.
Each PST must retain its own internal-current and tap constraints in the coordinated study [2].
References
- B. Cook, M. J. Thompson, K. Garg and M. Malichkar, Phase-Shifting Transformer Control and Protection Settings Verification, 2018. DOI: 10.1109/CPRE.2018.8349815.
- IEC, IEC 62032:2012, Guide for the Application, Specification and Testing of Phase-Shifting Transformers.