Short-duration paralleling during a maintenance transfer still requires electrical compatibility. The fact that the overlap lasts only seconds does not remove ratio, phase, impedance or fault-current constraints. The approved operating study should define which sources may overlap, the maximum permitted duration, expected load and fault duty, and the protection state; the article should not be used as a live switching instruction.

A short overlap does not soften an incompatible connection
A severe phase or voltage mismatch produces current as soon as the sources are connected. Restricting the intended overlap to a few seconds does not remove that initial electrical stress. Distinguish a closed-transition transfer from an open-transition transfer with an interruption, and identify the permitted source pairs for each. The study must use the voltage and phase relationship at the common connection point, including transformer displacement and any independent generator or utility source behavior.
Analyze the fault that occurs during the overlap
The overlap state can have a higher fault level than either normal supply state because both sources contribute. Check switchgear, transformer through-fault duty, CT performance and the protection logic active during that interval. A low annual probability of overlap is not a substitute for checking the equipment duty. Also establish what happens if the transfer does not complete within its permitted interval; an intended transient state must not become an unassessed continuous operating mode.
Issue conditions for the authorized transfer procedure
The engineering deliverable should identify allowed source combinations, load limits, protection groups, interlocks and the maximum approved overlap condition. It should also identify any requirement for source synchronization or utility authorization. The operating team can then develop and validate the site-specific procedure with the equipment suppliers. Do not convert the study into a generic sequence of breaker commands: the safe sequence depends on the actual installation, control implementation and operating authority.
Technical reference framework
[1] IEC 60076-8:1997 — Application guide.
[2] Schneider Electric — Substation including generators and parallel operation of transformers.
[3] IEEE C37.91-2021 — Protecting power transformers.