Validate the open-conductor model and the protection response as separate parts of the same coverage matrix. Each waveform must represent the intended transformer, source, load and instrument state before the relay result can establish coverage for that case.

Define the event coordinates
Identify winding connection, core representation, grounding and the physical opening location. Add source configuration, load magnitude and type, relevant concurrent fault and instrument-channel condition. Use only physically valid combinations, with exclusions recorded. [1]
Include the cases that challenge both detection and security: no load, ordinary unbalance, measurement-voltage loss, connected downstream sources and combined events where applicable. Do not choose only the waveform that makes the proposed detector easiest to demonstrate.
| Validation layer | Evidence retained | Conclusion it supports |
|---|---|---|
| Network and transformer model | Topology, parameters, assumptions and independent comparisons | Credibility of represented event quantities |
| Generated case waveform | Named nodes, initial state and numerical checks | Reproducible input for that modeled event |
| Offline scheme test | Actual configuration, input timing and observed response | Scheme behaviour for the supplied input |
| Field implementation boundary | Measurement, wiring, output and equipment coverage | Which real-chain functions remain separately unverified |
Check the generated inputs
Confirm phase order, polarity, units, voltage/current bases and measurement locations before exporting test inputs. Preserve transient history where it matters. A steady phasor file cannot represent an unmodeled motor, inverter or control-state transition. [1]
Check convergence and consequential parameter sensitivity against independent cases. The SEL open-phase analysis studies a specified Dyn application [1]. Use the fundamentals paper’s core-dependent ampere-turn constraints when checking magnetic topology [2]; identify the actual excitation parameters separately before exporting a waveform.
Record required and observed outcomes separately
For each case, save the project’s required behaviour before the test and the actual observed indications, timing and outputs afterward. Include disabled, supervised and degraded-information states. A blocked result can be correct for one case and reveal a coverage gap for another; the disposition needs its reason. [1]
If combined cases are selected rather than exhaustively enumerated, state the coverage strategy and remaining combinations. Passing a finite set demonstrates that set under its conditions. It is not a guarantee that every possible event or implementation fault has been exercised.
Keep the real-chain boundary visible
Identify whether the offline test covers the relay alone, its input chain or downstream actuation. A simulated trip bit does not establish operation of untested equipment. Retain model, software, settings and waveform versions so a later revision can identify affected cases. [1]
Deliver the versioned case register with input-model validation, required behavior, observed outputs and unresolved implementation gaps. Identify the tested extent of the measurement and actuation chain for each result, then assign the remaining cases and evidence to the responsible engineering review.
References
- J. LaBlanc, Y. Shah and J. Aultman, Schweitzer Engineering Laboratories, Revisiting Open-Phase Detection for Fuse-Protected Power Transformers, 2024.
- B. Kasztenny, M. Thompson and N. Fischer, Schweitzer Engineering Laboratories, Fundamentals of Short-Circuit Protection for Transformers, 2012 revision.

