The splash zone changes a subsea transformer’s lifting loads rapidly. Buoyancy varies with immersion, while wave motion adds dynamic forces. Assess the transition from air to partial immersion and full submergence using the actual assembly geometry, mass and marine conditions. [1]

Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Subsea Transformer Lifting Loads through the Splash Zone: technical review table
Separate the load components

Separate the load components

For a restricted vertical load balance with upward acceleration a, write T ≈ mg − B + (m + madded)a + Fhydro, using a consistent sign for the hydrodynamic term. B is buoyancy for the actual immersed volume. Added mass represents surrounding fluid acceleration in an appropriate model. The remaining hydrodynamic term includes relative-flow drag and other justified effects not already represented by buoyancy or the added-mass term.

This schematic expression is not a lift design formula. During entry or exit, impact, changing wetted geometry, trapped water, wave kinematics and crane/vessel motion can require a time-domain treatment. Added mass and drag coefficients depend on geometry and the modeled motion.

Lift stateChanging componentCheck at the lifting structure
In airGravity and retained liquid or attached equipment massActual mass, center of gravity and sling geometry
Initial water entryIncreasing buoyancy and possible impactTransient load path and asymmetric wetting
Partial immersion in wavesTime-varying displaced volume and relative motionPeak tension, slack risk and unequal lug loading
Fully submerged motionBuoyancy, added mass and dragDynamic tension rather than dry weight alone
Exit and drainageLoss of buoyancy and possible retained waterChanging mass and peak load during recovery

Compare static and accelerated states

For an illustrative 30,000 kg assembly displacing 20 m³ when fully submerged in water of density 1,025 kg/m³, dry weight is 294.3 kN and buoyancy is 201.1 kN. Its static submerged apparent weight is about 93.2 kN. With assumed added mass of 5,000 kg and upward acceleration of 0.5 m/s², the inertial term adds 17.5 kN, giving about 110.7 kN before other hydrodynamic loads.

None of these assumed values establishes a permitted sea state, crane capacity or sling rating. Partial immersion has a different buoyancy, and wave motion can change both acceleration and relative-flow loads.

Resolve the load into actual lifting points

Transfer the time-dependent force and moment result into the actual lifting-point geometry. Inclined slings, an offset center of gravity and asymmetric buoyancy can produce unequal loads even when the total vertical force appears moderate. Check the assembly frame and attached components as well as the main lugs.

Base the lift assessment on the defined geometry, mass state and marine-motion conditions. Carry the changing buoyancy and dynamic loads through to each lifting point and the supporting frame.

Carry one assembly through the lift sequence

Use the same assumed 30,000 kg assembly and 20 m³ displacement as above [2]. For a restricted comparison, assume upward acceleration 0.5 m/s², no drag or entry impact, two equal slings each 45° from vertical, and added mass 0 kg in air or 5,000 kg fully submerged. Air hook force is 30,000(9.81+0.5) = 309.3 kN. Fully submerged it is (30,000−1,025×20)9.81+(30,000+5,000)0.5 = 110.695 kN.

Equal sling tension is T/(2cos45°), giving 218.7 kN per sling in air and 78.3 kN submerged. Selecting from the latter alone would miss a 2.79-fold larger modeled demand in air. Carry all intermediate immersion and motion states into the marine lift analysis, including unequal buoyancy, entry impact, drag and vessel motion, before selecting hardware or crane duty.

References

  1. IEC/IEEE, IEC/IEEE 61886-2:2025, Subsea equipment — Part 2: Power transformers.
  2. U.S. Department of Energy, DOE-HDBK-1012/3-92, Thermodynamics, Heat Transfer, and Fluid Flow, Volume 3, 1992.
Chenfan Electric

Direct coordination

Start a conversation.

A drawing, a material requirement, or a project to discuss.

Send drawing