Building and Shipping Large Power Transformer Cores

  • Chenfan Power

At Chenfan Electric, single-core manufacturing capability reaches 100 tonnes, subject to project geometry, assembly and handling review. Our large power transformer core references include an assembled five-limb core for a 125 MVA transformer and an assembled three-phase step-lap core for a 330 kV transformer project. Our monthly processing capacity is approximately 1,500 tonnes.

Assembled five-limb core for a 125 MVA power transformer
Assembled five-limb core for a 125 MVA power transformer project.

Decide where final assembly takes place

Start with the approved drawing and agree on the delivery format. A complete core can reduce assembly work at the receiving factory. Where site access or lifting capacity limits the size of a single piece, pre-stacked lamination packets may be more practical. State who completes stacking and clamping, and list any parts or tooling the receiving team needs.

Check lifting and packing before production

Share the receiving crane capacity, maximum dimensions for each shipping unit and any unloading restrictions. Ask for separate weights for the assembled core or individual packets and for each packed shipping unit. Confirm lifting points, packet markings and transport restraints before freezing the delivery plan.

What to send for a project review

Provide the latest core drawing, the CRGO grade and thickness, quantity, preferred delivery format and any receiving limits. Include the dimensional tolerances and inspection records required for acceptance. With these inputs, Chenfan Electric can review the build and delivery scope together.