Test-source impedance interacts with the object and can bias dielectric-response estimates based on upstream voltage. Establish the actual object boundary, characterise the source transfer and check the correction residuals.
The conventional HV system includes regulator, transformer and other conditioning components. Their combined port behavior, not just one winding’s nominal ratio, defines the source boundary relevant to the measurement. [1]

State the port model being removed
For a linear sinusoidal single-port model, let E be the open-circuit equivalent source voltage, Zs its complex impedance and I the current entering the object. The object’s voltage is Vobj = E − ZsI. Its admittance is therefore Yobj = I/(E − ZsI).
These quantities must refer to the same frequency, polarity and operating boundary. An LV impedance cannot be subtracted directly from HV quantities. Include accessory branches separately or define clearly whether they belong inside the source or object port.
If actual object voltage is already measured with suitable accuracy, use that measurement directly. De-embedding is not a reason to replace a stronger terminal observation with a weaker model.
Identify source behavior independently
| Model input | Evidence required | Failure to check |
|---|---|---|
| Equivalent source voltage | Characterized source state and waveform | Assuming it remains fixed as control or loading changes |
| Complex source impedance | Supported reference-load characterization | Using magnitude only when phase matters |
| Measurement channels | Voltage/current transfer and uncertainty | Correcting the source while ignoring channel mismatch |
| Independent reference | A load not used to fit the model | Calling fitted agreement validation |
Use enough characterization information to distinguish E and Zs under the relevant source condition. One unknown-load observation generally does not identify both source and object properties. A regulated source may also change its equivalent E with load, making a fixed-source assumption inadequate.
Check whether the inversion is stable
When E and ZsI nearly cancel, the inferred object voltage becomes sensitive to small errors in either term. Propagate their complex uncertainties rather than report many digits in Yobj. A correction that increases noise or produces physically implausible residuals may be outside the useful model boundary.
Compare the corrected response with an independent characterized load and inspect residuals across frequency and operating point. Systematic residuals can indicate an omitted branch, wrong source state or inadequate phase characterization.
Keep raw and corrected data together with the model version. Verify linearity, source-state stability and residual behaviour across the reported range, then investigate features outside that range with additional measurements.
Reconcile the de-embedded phasor with a passive load
Use complex source/load quantities on one reference basis [2] and assess the assembled voltage-measuring system [3].
Assume an HV-referred 50 Hz source E = (95 + j0.5) kV, series impedance (1 + j10) kΩ and measured load current j0.50 A. Then ZsI = (−5 + j0.5) kV and Vobj = 100 kV. Using |E| = 95.001 kV instead of the object voltage understates it by 4.999%. The capacitive admittance is j5.0 μS. Verify that corrected result with an independent terminal measurement.
References
- HIGHVOLT Prüftechnik Dresden GmbH, HVAC Test Systems Based on Transformers, 1.10/5 WP, November 2020.
- U.S. Department of Energy, DOE-HDBK-1011/3-92, Electrical Science, Volume 3, June 1992.
- IEC, IEC 60060-2:2025, High-voltage test techniques — Part 2: Measuring systems.