Repeated withstand tests accumulate heat between energised intervals. Model residual temperature, off-time, load and cooling across the sequence to establish the test transformer’s repeated-duty capability.
HIGHVOLT distinguishes short-term from continuous transformer-based designs and gives a separate load-dependent duty cycle for its variable-frequency resonant system. These are design-specific duties, not interchangeable descriptions of a single output kVA. [1]

Convert the test schedule into a load history
Record voltage, frequency and total capacitance for each object. The capacitive current is ωCV under sinusoidal assumptions, while losses and heating depend on the actual source design and operating waveform. Include accessories and any relevant resistive load.
Retain voltage-ramp periods and holding periods separately where their losses differ. An off interval may still leave auxiliary equipment energized or cooling operating in a different state. Describe what off means rather than assigning zero loss to the complete system by default.
| Schedule entry | Thermal input to retain |
|---|---|
| Initial condition | Oil and relevant internal starting temperatures |
| Energized interval | Actual load, loss estimate and duration |
| Off interval | Remaining losses, cooling state and duration |
| Object change | New capacitance and resulting source duty |
| Repeated sequence | Temperature carried from the preceding interval |
Carry thermal memory across every interval
A simple illustrative node has equilibrium incremental rise Δ∞ during energization and time constant τ. Its end-of-on state is xend = xstart exp(−Ton/τ) + Δ∞[1 − exp(−Ton/τ)]. With zero added off-loss and the same assumed time constant, the next start is xnext = xend exp(−Toff/τ).
Take assumed Δ∞ = 30 K, τ = 600 s and equal 60 s on/off intervals. The first on interval from zero adds about 2.85 K. At periodic equilibrium, the end-of-on increment is about 15.75 K. The same individual test duration therefore gives a substantially different starting and ending state after repetition.
This calculation is not a duty recommendation. It demonstrates why restarting a thermal estimate from ambient for every test loses the accumulated exposure. A real transformer needs its validated loss and thermal representation.
Check the actual governing temperature
Track the relevant winding, oil and other supported local temperatures. A slowly responding oil sensor can understate a faster internal rise, while off-time requirements may depend on a different governing node.
Compare the complete planned sequence with the manufacturer’s supported duty, including initial condition, ambient environment and cooling. Where the schedule is outside that basis, obtain a design-specific assessment or revise the schedule.
Specify the energised burden and recovery conditions for the complete sequence. Carry residual temperature from one test into the next when checking the governing thermal duty.
Compare the repeated schedule with its thermal gate
Keep the heat-transfer model and operating schedule together [2]; the resonant catalogue also ties duty to current and environment [3].
For assumed equilibrium increment 30 K, time constant 600 s and 60 s energization, periodic end-of-on rise is 15.75 K with 60 s off, versus 11.01 K with 120 s off. An illustrative assumed 12 K increment review gate separates those model schedules. Confirm the actual winding thermal model, ambient and cooling state before selecting the repeated-test duty.
References
- HIGHVOLT Prüftechnik Dresden GmbH, HVAC Test Systems Based on Transformers, 1.10/5 WP, November 2020.
- U.S. Department of Energy, DOE-HDBK-1012/2-92, Thermodynamics, Heat Transfer, and Fluid Flow, Volume 2, 1992.
- HIGHVOLT Prüftechnik Dresden GmbH, Applied Voltage Test System for Transformers, 8.72/4 Type WRV M, November 2020.