Cascade Excitation Windings Carry Unequal Stage Duties

  • Chenfan Power

In a cascade test-transformer arrangement, lower-stage excitation windings transfer power to the stages above as well as supplying their own HV output. Calculate each winding’s assigned duty across the complete stack.

Manufacturer literature confirms that cascaded test systems exist and that duty ratings depend on the design. It does not establish the internal winding allocation of a particular unit. The following map applies only to the explicitly defined ideal arrangement. [1]

Cascade Excitation Windings Carry Unequal Stage Duties: technical review table
Define the cascade before summing its power

Define the cascade before summing its power

Assume three stages, each adding an in-phase HV voltage Vstage. Their HV windings are in series and carry the same load current I. Stage one supplies stage two through an excitation winding, and stage two similarly supplies stage three. Ignore losses and accessory loads for this first calculation.

Let each HV winding deliver complex power S = Vstage I*, where voltage and current are RMS phasors. A capacitive test object makes this largely reactive power. It is still a winding current and insulation duty; zero ideal real power does not mean zero equipment burden.

StageLocal HV outputExcitation transferred upwardIdeal stage input
BottomS2S3S
MiddleSS2S
TopSNone in this arrangementS

The bottom excitation winding transfers the middle stage’s local output plus the top stage’s demand. Its current must be calculated at its own excitation voltage. The fact that every HV winding carries I does not allow that same current to be assigned to a winding at another voltage.

Add the duties omitted by the ideal map

Include winding losses, excitation requirements and accessories at the stage where they occur. Platform-to-ground capacitance can add current that is not the test object’s series current. Different stage impedances can also change the voltage contributions and power distribution.

For each winding, retain its terminal voltage, current waveform, loss estimate and duty cycle. Internal heating follows those local quantities and the cooling arrangement, not the stack’s output kVA divided by the number of stages.

Lower stages can therefore require different conductor or thermal provisions from upper stages even when their HV voltage contributions are nominally equal. This is a design calculation, not a claim that every commercial cascade uses identical interstage feeding.

Check the actual topology against the map

If stages use separate isolated feeds, a different excitation arrangement or compensation at intermediate potentials, redraw the power paths. Do not retain the ideal 3:2:1 input allocation after changing the circuit that produced it.

Specify stage-by-stage winding duty and verify the thermal evidence for the intended load and test schedule. Include the downstream power transferred through each interstage excitation winding.

Rate the lower excitation winding for transferred power

Use winding-specific voltage, current and apparent power in the transformer duty calculation [2].

Assume three equal in-phase 100 kV stages carry 0.10 A RMS capacitive load, with losses and accessories omitted. Each HV winding supplies 10 kVA, and ideal stage inputs are 30, 20 and 10 kVA from bottom to top. The bottom excitation link transfers 20 kVA upward; at an assumed 230 V it carries 86.96 A. Use that local winding current when reviewing the lower-stage heating.

References

  1. HIGHVOLT Prüftechnik Dresden GmbH, HVAC Test Systems Based on Transformers, 1.10/5 WP, November 2020.
  2. U.S. Department of Energy, DOE-HDBK-1011/4-92, Electrical Science, Volume 4, 1992.