Grounding resistance changes the DC network solution and can shift GIC in transformers well beyond the station where it changes. Assess uncertainty across the connected network to identify which grounding measurements control the transformer-current range. [1]
Preserve the distinction between earth-conductivity uncertainty used to compute the geoelectric field and station grounding resistance used in the electrical network. They enter different parts of the calculation and should not be collapsed into one generic soil factor.

Assign intervals to identified station parameters
For each grounding parameter, record the evidence date, measurement or estimate basis, credible range and any dependence on neighboring conditions. Include intentional bonds or shared station networks where the model requires them. A single resistance per station is a model reduction that should be justified, not an automatic description of every neutral path.
Bailey and colleagues used explicit regional network and resistance assumptions. Those assumptions support their model construction, not a default value for another site. Obtain the installed-network evidence where it materially changes the target transformer current. [1]
| Scenario family | Parameter change | Output retained |
|---|---|---|
| Individual station perturbation | One resistance across its credible interval | All affected transformer branch currents |
| Credible correlated change | Linked grounding parameters change together | Redistribution under a shared physical condition |
| Connected-state variation | Available lines, transformers or bonds change | Whether the sensitive station changes |
| Model-reduction variation | Separate neutral paths versus an equivalent | Error introduced by aggregation |
Rank sensitivity using a stable current basis
An absolute local sensitivity can be approximated by ΔIt/ΔRg, in amperes per ohm, where It is the identified transformer current and Rg the perturbed grounding resistance. State the finite perturbation used and whether it represents a local slope or a broad interval comparison.
A normalized sensitivity involving division by It becomes unstable near zero or a current-direction reversal. In those cases report the signed current range and absolute change instead. A small nominal current can be highly uncertain in sign without implying a large heating duty.
Evaluate the geoelectric-field directions and network states relevant to the study. A station that is sensitive under one field direction may not govern under another. Current allocation depends on the imposed line-driving voltages as well as resistance.
Carry the uncertainty into the equipment assessment
Provide the target unit’s current time-series envelope or justified scenarios, retaining phase and winding definitions. The downstream thermal model also needs waveform duration and loading; resistance sensitivity cannot be turned directly into a damage ranking. [2]
Prioritise better grounding evidence at the stations that dominate the current sensitivity. Report the resulting transformer-current range and the grounding assumptions responsible for its spread.
References
- R. L. Bailey and coauthors, Modelling geomagnetically induced currents in midlatitude Central Europe using a thin-sheet approach, Annales Geophysicae 35, 2017. DOI: 10.5194/angeo-35-751-2017.
- NERC, Transformer Thermal Impact Assessment White Paper, Project 2013-03 Geomagnetic Disturbance Mitigation, October 2017.