Auxiliary-Winding Terminal Faults in Grounding Transformers

  • Chenfan Power

Assess an auxiliary-terminal short circuit separately from the grounding transformer’s network earth-fault duty. The auxiliary fault drives its own winding and the coupled main winding, with a different leakage-field pattern and protection-clearing boundary. [1]

Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Specify which auxiliary terminals are faulted, whether the fault includes earth, and what sources remain connected. A three-phase terminal short circuit, a line-to-line fault and a line-to-earth fault are different cases. Auxiliary loads, connected motors or other sources may also contribute before their own protection operates.

Auxiliary-Winding Terminal Faults in Grounding Transformers: technical review table
Map clearing to the actual protection boundary

Trace a terminal fault into the winding

Connected bus → main-winding phase paths
↕ magnetic coupling and leakage field
auxiliary winding → terminal fault
↑ possible auxiliary-side contribution
Neutral branch: include where the fault topology excites it

This is a conceptual study sketch. It deliberately does not route every auxiliary fault through the neutral resistor. A resistor limiting a network earth-fault current may have little relevance to a balanced auxiliary three-phase short circuit.

Solve terminal currents and then map them into every winding section. For a zigzag main winding, retain the section locations and signs. For a grounded-star and delta arrangement, retain delta circulation where the sequence network permits it. A generic turns-ratio conversion that ignores the connection can assign the wrong current to a section.

Use the peak waveform for the force question

The local conductor force is related to the current and leakage field at that location. In elementary form, force per unit length has magnitude iB for a perpendicular field, where i is amperes, B is teslas and force per unit length is newtons per metre. Direction follows the current and field vectors.

If both fault current and the relevant leakage field scale together in an unchanged linear geometry, force scales approximately with current squared. That conditional relationship does not make an RMS thermal current a substitute for the asymmetric peak. Preserve offset, inception angle and source impedance in the short-circuit waveform used for mechanical assessment.

Axial and radial forces depend on section alignment, end fields and supports. The same terminal current can produce different local demands after a winding-position or lead-routing change. The assessment therefore needs geometry as well as current.

Map clearing to the actual protection boundary

Fault regionCurrent informationProtection question
Auxiliary terminal and outgoing connectionAll connected-source contributionsWhich devices detect and clear this region?
Internal auxiliary sectionSection waveform and coupled main responseDoes the selected protection zone include it?
Main winding and series junctionsMapped fault current and local leakage fieldWhat clearing time governs their withstand?

A neutral CT measures its own neutral path, not every internal auxiliary fault. Confirm coverage using the complete protection arrangement rather than assuming that the grounding function makes all faults visible.

Carry both fault cases into the design review with their section-current maps, peak mechanical demands and clearing times. Identify the governing section and attach the corresponding test or calculation evidence.

Separate terminal-fault energy from earth-fault energy

Specify the earthing-transformer function and its test boundary under the applicable reactor standard [2].

Assume the governing auxiliary section carries 800 A RMS for 0.10 s in a terminal short and 200 A for 1.0 s in an earth fault. Their current-time integrals are 64,000 A²·s and 40,000 A²·s. The auxiliary short is 60% higher on this thermal screen. Carry both peak-force and current-time cases into the section assessment.

References

  1. D. De Ronde, R. VanHatten and A. Wade, Loss of Effective System Grounding — Best Practices, Protection Challenges, and Solutions, Schweitzer Engineering Laboratories, 2015.
  2. IEC, IEC 60076-6:2007, Power transformers — Part 6: Reactors.