A phase-shifter fault can receive contributions from both energized terminals through different internal paths. Map their sequence and component currents to establish winding, lead and switching duty across the relevant states. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.

Draw contributions before adding them
For every fault location, trace the sending-system contribution and the receiving-system contribution separately through the actual tap and connection state. Include the source impedances and relevant grounding paths. Transfer phasors to one common reference before forming the fault-node sum; transformer ratio and phase displacement must be applied consistently.
| Fault region | Sending-side path | Receiving-side path | Quantity that needs its own result |
|---|---|---|---|
| Sending terminal outside the assembly | Local system source path | Path through the connected phase-shifter assembly | Terminal current and currents through each intervening component |
| Intertank connection, where present | Path through the first magnetic unit and connection | Path through the second unit and connection | Individual lead and winding contributions |
| Internal winding or lead region | Actual internal branch from sending source | Actual internal branch from receiving source | Faulted-section current, forces and heating |
| Receiving terminal outside the assembly | Path through the assembly | Local receiving-system source path | Receiving terminal duty and through-assembly current |
This map is deliberately conditional. A single-tank design or a different internal connection requires a different set of paths. External source strengths do not supply the missing internal circuit.
Combine source contributions as phasors
Consider an illustrative symmetrical fundamental-frequency result at one fault node: IS = 5 kA at 0 degrees and IR = 4 kA at minus 60 degrees, both expressed in the same reference. The resultant magnitude is √(5² + 4² + 2 × 5 × 4 × cos 60°) = 7.81 kA. Adding the magnitudes would give 9 kA and discard their angular relation.
The 7.81 kA value describes only that assumed node and that assumed steady sinusoidal component. It is neither the instantaneous peak nor the current in every internal winding. A branch carrying only one source contribution must be assessed using its own current, transformed to its own winding reference.
Carry the right waveform into the duty assessment
Mechanical force depends on instantaneous current and field, while heating depends on the relevant current history and resistance. Source X/R ratios, fault inception, clearing sequence and magnetic behavior can affect asymmetrical duty. A symmetrical phasor calculation therefore needs additional justified treatment before it supports peak-force or short-time thermal conclusions.
Repeat the contribution map across relevant tap states, source configurations and fault locations. Check whether a first interruption removes one contribution while leaving another energized path. The deciding result is the duty of the particular component over the fault sequence; the largest bus-level number is only one part of that assessment.
Assign current-squared time to the conductor that carries it
Continue the assumed 5 kA at 0° and 4 kA at −60° contributions on one 50 Hz reference. The PST topology and current mapping remain essential [2]. Assume constant symmetrical RMS currents for 0.10 s, neglecting DC offset and interruption transients.
The sending-only branch accumulates 5²×0.10 = 2.5 (kA)²·s; the receiving-only branch accumulates 1.6 (kA)²·s. A common conductor actually carrying their phasor sum accumulates 7.810²×0.10 = 6.1 (kA)²·s, equal to 6.1×10⁶ A²·s. Assigning the combined value to either source-only branch would be incorrect. Adding current magnitudes gives 9 kA and 8.1 (kA)²·s, overstating the assumed common-path value by 32.8%.
Use the physical branch map and full clearing sequence to select each thermal current history. This symmetrical calculation does not establish instantaneous mechanical duty or component withstand.
References
- B. Cook, M. J. Thompson, K. Garg and M. Malichkar, Phase-Shifting Transformer Control and Protection Settings Verification, 2018. DOI: 10.1109/CPRE.2018.8349815.
- IEC, IEC 62032:2012, Guide for the Application, Specification and Testing of Phase-Shifting Transformers.