Combining two phase-shifter tanks requires verification of the named series and excitation units together. Reconcile identities, intertank connections and control references to establish the assembled device’s evidence boundary. [1]
Calculation basis. Project-specific values and gates in the illustrative screens below are assumptions; cited catalogue values retain their source test conditions.
Bind each unit’s serial identity and relevant revision to the intended pair. Include the connection drawing, tap/angle map and control configuration. A report for a similar unit or an earlier connection revision may not describe the delivered combination.

Prepare the unit-to-assembly evidence handover
| Handover item | Identity or condition to preserve | Combination question |
|---|---|---|
| Series-unit records | Serial, winding/terminal map and test scope | Does it belong to this designed pair? |
| Excitation-unit records | Serial, tap function and relevant test scope | Are its physical states matched to the series unit? |
| Intertank conductors | Endpoint labels, phase/polarity, length and construction | Does the assembled route reproduce the intended model? |
| CT/VT and protection records | Actual cores, ratios, polarity and zone references | Do assembled measurements correspond to qualified logic? |
| Control configuration | Tap feedback, angle signs and approved revision | Does a command identify the achieved physical state? |
| Combined verification plan | Actual assembly boundary and applicable tests | Which relationships were not demonstrated by separate tests? |
Identify what separate tests establish
A unit test supports the reported connections and imposed conditions. It may confirm component properties without establishing the final combined phase-angle relationship, intertank transient behavior or protection-zone coverage. State the actual scope instead of assuming every assembly property was implicit.
Retain any temporary test connections and their differences from the delivered route. An intertank length or grounding change can affect another model boundary even when the unit’s internal construction remains unchanged.
Verify the combined relationships under approved conditions
The plan should address endpoint identity, phase/polarity, tap mapping and relevant complete-system measurements using the applicable qualified procedures. It should also name the tests or model checks needed for the final control and protection references.
Do not select a combined test solely because it is easy to perform. Choose the evidence that closes the missing relationship. A successful local insulation measurement, for example, does not independently confirm the overall phase-angle sign.
Keep discrepancies attached to the affected identity
If one unit, cable set or control file is replaced, update the pair record and revisit the relevant combined checks. A test report should not be silently inherited by a changed assembly.
Resolve label discrepancies through verified drawings and qualified measurements rather than a convenient interpretation of matching phase letters. The physical endpoint and polarity relationship controls.
Release the assembly evidence as a named pair with its final connections and supported combined verification. Separate unit reports remain valuable, but the handover must show how their scope is joined and which final relationships were actually demonstrated.
Expose a connection error that separate magnitudes cannot detect
Combined PST verification must preserve phase-angle and connection references [1][2]. Assume a simplified 50 Hz series-injection model: the receiving voltage on a common per-unit base is 1+j0.10. Its magnitude is √(1+0.10²) = 1.00499 pu and its angle is +5.711°.
Reversing the injection polarity gives 1−j0.10. The magnitude remains 1.00499 pu, but the angle becomes −5.711°, an 11.421° sign error. Separate magnitude or insulation checks on the two units cannot distinguish these assembled states.
Verify the named pair’s endpoint polarity, tap sign and complete phase relationship against its actual topology before accepting the control map. This assumed injection circuit demonstrates the missing relationship; it is not a universal PST connection equation.
References
- B. Cook, M. J. Thompson, K. Garg and M. Malichkar, Phase-Shifting Transformer Control and Protection Settings Verification, 2018. DOI: 10.1109/CPRE.2018.8349815.
- IEC, IEC 62032:2012, Guide for the Application, Specification and Testing of Phase-Shifting Transformers.

