Technische Videothek
CRGO Coil Verification and Coil-to-Core Traceability
Technische Zusammenfassung
A material certificate needs a reliable link to the CRGO coil being processed. This video covers coil identification, incoming magnetic tests, thickness, coating and surface condition. It follows that identity through slitting, cutting and core assembly so later findings can be traced to the steel actually used.
Transkript
The certificate names a grade. Can it identify the coil in front of you? Secondary material can include coating defects, thickness variation or loss outside the stated specification. Mixed lots can break the link between paperwork and steel. These differences may be difficult to identify by appearance alone. Follow one coil through receiving and production. Match its identification to the mill certificate. Take incoming samples for the agreed magnetic tests. Check thickness, coating and surface condition. Keep the coil identity attached as material is cut and built into a core. If a problem appears later, that record should lead back to the source coil. Verify the material, then preserve the traceability.
