WEBVTT 00:00:00.452 --> 00:00:02.257 Start with the market requirement, 00:00:02.457 --> 00:00:03.744 then work back to the core 00:00:03.759 --> 00:00:04.770 specification. 00:00:05.636 --> 00:00:07.549 Confirm which efficiency requirement 00:00:07.564 --> 00:00:09.863 applies to the transformer being supplied. 00:00:10.715 --> 00:00:11.686 Define the rating, 00:00:11.808 --> 00:00:13.577 voltage class and loss limits for 00:00:13.592 --> 00:00:14.316 that case. 00:00:15.168 --> 00:00:17.119 Compare the design no-load loss with 00:00:17.134 --> 00:00:18.209 the required limit. 00:00:19.061 --> 00:00:21.012 Compare production measurements with both 00:00:21.027 --> 00:00:22.428 the target and that limit. 00:00:23.280 --> 00:00:24.642 When more margin is needed, 00:00:24.790 --> 00:00:25.853 review steel grade, 00:00:25.988 --> 00:00:27.324 design flux density, 00:00:27.446 --> 00:00:29.980 joint geometry and build quality together. 00:00:30.845 --> 00:00:32.796 Lower flux density can require a 00:00:32.811 --> 00:00:35.439 larger core, with consequences for windings 00:00:35.454 --> 00:00:36.139 and cost. 00:00:36.991 --> 00:00:39.398 Control burrs, gaps and stacking instead 00:00:39.413 --> 00:00:41.269 of treating them as minor details. 00:00:42.121 --> 00:00:44.124 Confirm the supply chain can process 00:00:44.139 --> 00:00:46.168 the selected material before freezing the 00:00:46.183 --> 00:00:47.116 specification.